Price: Check with seller

Description

Encardio-rite feels proud to be involved in the monitoring of Rohtang Tunnel, the world's longest single tube highway tunnel at an altitude of 3,000m. Besides geotechnical monitoring during tunnelling, we also continuously conducted geophysical prediction by Tunnel Seismic Prediction System (TSP) ahead of tunnelling to enable early recognition of fault or fracture zones or zones where the rock mass characteristic changes.

Contact us:
Encardio-rite Electronics Pvt. Ltd.
A-7, Industrial Estate, Talkatora Road Lucknow, UP-226011, India
+91 522 2661039
erdelhi@encardio.com

More Details

Total Views:51
Reference Id:#1919859

Comments

Copyright © 2008 - 2024 |   All Rights Reserved |   tuffclassified.com |   24x7 support |   Email us : info[at]tuffclassified.com